en

NTT Data in talks to build Anthropic's first Japan data center

The Arena

NTT Data in talks to build Anthropic's first Japan data center

The overnight inbox is an infrastructure story dressed as a rumor, plus two research-side reads: a paper arguing capability audits have a cryptographic hole, and Ben Recht taking a hatchet to OpenAI's math dump. NTT Data is in advanced talks to build a data center for Anthropic in Osaka with capacity of up to 500 megawatts — among the largest in Japan, with construction costs potentially reaching 1 trillion yen ($6.3 billion).

Musk: only three organizations have enough coding data

The Arena

Musk: only three organizations have enough coding data

The chip suppliers and the biggest buyer of chips are suddenly telling the same story: capability is no longer the bottleneck — money is. Elon Musk spelled out what he thinks the scarcest training input actually is, and the chiefs of Intel and Broadcom spent a day in Singapore arguing that access to capital may decide who survives the next phase. Elon Musk says only three organizations in the world have accumulated enough coding training data — and xAI was not one of them.

How to — review AI-written code before you merge it

The Stack

How to — review AI-written code before you merge it

You want to merge AI-written code without reading every line of it — and still be able to say, out loud, what it does and what happens when it breaks. That is a review job, and it is mostly about reading the right parts in the right order. Cockroach Labs ran its codebase like a teaching hospital for five months and reports merging well over a million lines of code with seven total reverts — a run where no agent's plan moved without a human-signed review first (we covered Coding agents as a…

AI 101 — What is an AI data center?

The Stack

AI 101 — What is an AI data center?

An AI data center is a building full of specialized computers — mostly GPUs — designed from the power feed to the cooling pipes to train and run AI models at massive scale. From the outside it looks like any windowless warehouse. Inside, the difference is density: racks of chips packed so tight, and drawing so much power, that ordinary air conditioning and ordinary grid connections no longer do the job. Why it matters right now. These buildings have become the physical front line of AI.

GPT-4o's first API snapshot shuts down on October 23

The Everyday

GPT-4o's first API snapshot shuts down on October 23

Eight months after GPT-4o left ChatGPT, the people who refuse to say goodbye are counting down to a new date — and a community tool built on DeepSeek's agent harness lands this weekend. OpenAI will deactivate gpt-4o-2024-05-13, the very first GPT-4o API snapshot, on October 23 — 12 days from now. The company's own deprecation page lists the shutdown with a suggested replacement, and it's the last remaining line item for the model that debuted in May 2024 with Altman's one-word post, "her."…