Chips & Infrastructure

AI data center risk is heading for the catastrophe bond market

The Arena

AI data center risk is heading for the catastrophe bond market

The AI buildout has outgrown the insurance market meant to cover it — and the fix is about to be sold to hedge funds. This hour: the first data-center catastrophe bond is now a live design project, and a stealth radiology practice is betting that owning the clinic beats selling it the model. Not one dollar of data center risk has reached the catastrophe bond market yet, and the first dedicated deal is expected within 12 to 18 months — because the arithmetic has stopped working in the…

ElevenLabs' Music v2.5 ships with lossless downloads on the free plan

The Stack

ElevenLabs' Music v2.5 ships with lossless downloads on the free plan

ElevenLabs released Music v2.5, calling it the best version of its music generation model yet — and paired the model upgrade with a rights change that matters as much as the sound. Every track made in ElevenMusic can now be downloaded losslessly and kept, with five downloads a day on the Free plan and 400 per month on Pro, and the company says the rights to what you make attach the moment you create a track, surviving cancellation or a plan downgrade. ElevenLabs shipped Music v2.5 today, and…

Iran war forces UAE to redraw its 5GW AI data center map

The Guardrails

Iran war forces UAE to redraw its 5GW AI data center map

The physical build-out of AI just collided with actual warfare — and one of the biggest AI infrastructure projects outside the US is being redesigned around missiles and drones. The United Arab Emirates is quietly revising its plan for a 5-gigawatt AI data center campus — one of the largest outside the US — after the Iran war forced a rethink of how critical AI infrastructure should be built, six people familiar with the matter told Reuters.

EPA moves to strip public comment from data center pollution permits

The Guardrails

EPA moves to strip public comment from data center pollution permits

The AI buildout's next fight is over who gets to object to it. The Environmental Protection Agency is planning to eliminate a federal requirement that states notify the public and take comments before approving air-pollution permits for industrial facilities — a rule that covers the data centers rising across the country and the power plants built to feed them. A separate proposal from last month would go further and let developers begin building before their permits are approved at all.

OpenAI ends $1-a-year government pilot for 50%-off usage billing

The Stack

OpenAI ends $1-a-year government pilot for 50%-off usage billing

OpenAI's $1-a-year experiment in government is over. A new 27-month OneGov agreement announced by the General Services Administration replaces the $1-per-agency pilot with token-based, pay-for-what-you-use pricing at a 50% discount, starting October 1 — one day after the current deal expires. There is no platform fee, no minimum order, and no spend commitment, and the discount reaches federal, state, local and tribal agencies.

Tesla's Cybercab launched on a certification NHTSA never approved

The Stack

Tesla's Cybercab launched on a certification NHTSA never approved

Every automaker in America vouches for its own vehicles. Tesla just found out what happens when the vouching gets creative — and a regulator that likes autonomous vehicles anyway starts reading the fine print. The probe is about paperwork, not driving When Tesla put its first Cybercabs on Austin's streets on September 3, it did so without a federal exemption, without a waiver, and without steering wheel, pedals, or sideview mirrors — three features the Federal Motor Vehicle Safety Standards…